I have a large test specification that runs on 4 separate threads in my VM, I want to manually organize the tests so that the 3 largest (time-taking) tests run concurrently on 3 separate threads. Is there a way that I can manually assign a certain set of specifications (tests) to run on thread A, and others on B, and so on?
Aucun commentaire:
Enregistrer un commentaire